Search

FEATURED INSTITUTIONAL PROJECT

Abbot was recently contracted to undertake a complex masonry restoration and repair project at the Museum of Science in Boston. Abbot had completed several smaller projects for the Museum in the past, and had developed a strong relationship with their facilities team.

The Museum initially hired a firm to provide an overall assessment of the building and to develop a schedule of essential work based on safety standards. The firm developed a timeline that identified items requiring immediate attention, and subsequent work to be completed within two to five years.

 

 

RECENT BLOG POSTS

Protect an In-Progress Masonry Repair from Spring Rain in MA

Protect an In-Progress Masonry Repair from Spring Rain in MA

Wet weather poses some challenges for masonry restoration and repair in MA. Here’s a look at some of these challenges and how we overcome them.

Read More
The Role of Protective Coatings in Concrete Restoration in MA

The Role of Protective Coatings in Concrete Restoration in MA

Protective coatings play an important role in concrete restoration in MA. Here’s a closer look at the often overlooked benefits of masonry coatings.

Read More
Proudly Serving
Greater Boston &
Eastern Massachusetts